July 26, 2010 ~ Remodel Day 1
The bathroom took on a few different forms on Day 1.
To this:
Which was after the removal of sheetrock, toilet, tub, and vanity.
Then this:
Which was the laying of the new subfloor.
And at the end of the day, the front yard looked like this..........
Habitat for Humanity is coming next week for our
tub, toilet, sink, and the infamous shower doors!
tub, toilet, sink, and the infamous shower doors!
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
July 27, 2010 ~ Remodel Day 2
We got sheetrock on the walls...........
And an unplumbed tub installed...........
And we resorted to begging people for showers.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
July 28, 2010 ~ Remodel Day 3
I was gone all day for a workshop at school. I left before Bob
even arrived, so I was anxious to get home to see the progress.
I was not disappointed.
Not only did the cement board get installed on the floor and
shower wall, there was progress on the sheetrock (patching the
seams) as well as the plumbing for the tub. And as if that wasn't
enough, I discovered that part of the kitchen wall we needed
work on had been sanded and painted! Bob is a rock star.
Oh. But can I use your shower?
I was gone all day for a workshop at school. I left before Bob
even arrived, so I was anxious to get home to see the progress.
I was not disappointed.
Not only did the cement board get installed on the floor and
shower wall, there was progress on the sheetrock (patching the
seams) as well as the plumbing for the tub. And as if that wasn't
enough, I discovered that part of the kitchen wall we needed
work on had been sanded and painted! Bob is a rock star.
Oh. But can I use your shower?